NAVIGAR Spółka z Ograniczoną
Odpowiedzialnością Spółka
Komandytowa
ul. Heyki nad Kanałem Zielonym
70-631 Szczecin

telefon: (+48 91) 462-38-99, (+48 91) 350-71-79
fax: (+48 91) 462-37-73


email: biuro@navigar.pl




Projects

History of the projects which “Navigar” company participated in:

1995 – 1997
Transport of mass goods with the use of barges.

1998
Purchase of pontoons and beginning of hydrotechnical works:
• building of Chlewice haven
• building of marking system – Szczecin – Swinoujscie water track

1999 do 2003
Beginning of the construction of bridge passage – Pioneers Bridge (Szczecin, co-operation with the companies – Montostal, Mostostal, Plock Bridge engineering company)
Towing of elements of the Pioneers Bridge

2000
Repair of the wharfs in Basen Górniczy – Szczecin harbour.
Works associated with building a ramp Wulkan Nowy in Szczecin Shipyard.
Repair of the Long Bridge (Szczecin).

2001
Transport of overhead crane elements: Opole – Hamburg

2002
Hydrotechnical works at rebuilding Piastowski Canal (Swinoujscie).

2003
Hydrotechnical works at building and transportion of Wolin Bridge spans.

2004
Special transports and transhipments in the port of Szczecin.

2005
Container freights.
Transports of ship sections to Papenburg shipyard.
Freight of engines from Poznan to Szczecin.

2006
Servicing the construction of bridge over Warta close to the town of Srem.
Servicing the construction of wharf in the port of Szczecin by the Parnica river.
Freight of covers in relation Szczecin - Stralsund.

2007
Servicing the construction of Bulwar Nadodrzanski wharf by PKP Szczecin train station.
Servicing the construction of 370 meters and 600 meters long pipelines connected with the construction of purification plant in Szczecin.
Servicing the construction of Gryfitow i Pomorzan bridge in Szczecin.
Servicing the regulation works of river Odra in the region of Ratzdorf.
Servicing the regulation works of river Laba in the region of Rosslau.
Towing of ship hulls of different types from Poland to Netherlands.
Servicing the construction of wharf in Swinoujscie.

2008
Servicing the regulation works of river Laba in the region of Laba (upper, middle and lower section).
Towing of ship hulls of different types from Poland to Netherlands.
Servicing the construction of the bridge over Odra in the region of Redzin.

2009
Servicing the regulation works of river Odra in the region of Kostrzyn.
Freight of oversized loads on Tadzko raft in Germany.
Freight of heavy loads in Gorna Wesera.
Towing of ship hulls of different types from Poland to Netherlands.

2010
Transport of reactors for Schwedt Refinery with the use of icebreakers.
Servicing the regulation works of river Odra in the region of Kostrzyn.
Freight of heavy loads Dresden - Hamburg, Dresden - Bremen.
Towing of ship hulls of different types from Poland to Netherlands.
Transport of rapeseed oil with the use of tanker.
Project „Construction of Protection Breakwater for Swinoujscie Outer Port“/ LNG Terminal

2011
Hydrotechnical works in Laba-Hawela canal.
Hydrotechnical works in Frankfurt (Oder).
Participation in "Reconstruction and extension of seacoast entrenchments in Kolobrzeg 330,4 - 333,4 km" project.

2012

• Hydrotechnical works in Laba-Hawela canal
• Hydrotechnical works in Kostrzyn (Warta)
• Participation in "Reconstruction and extension of seacoast entrenchments in Kolobrzeg 330,4 - 333,4 km" project
• Project „Construction of Protection Breakwater for Swinoujscie Outer Port“/ LNG Terminal
• Work by Pons navigation No.1 and No.2 in Pomeranian Bay
• Work by Extension the Underground U-5 in Berlin
• Hydrotechnical works in Wicko and Wolin
• Servicing the construction of bridge in Dziewoklicz/ Szczecin
• Transport of motor 83 tons : Berlin – Salzgitter
• Towing of 5 new pontoons from Wolgast to Hamburg
• Towing of ship hulls from Szczecin to Duisburg
•Transport of 340 tons reactor, 7,65m in diameter, from Szczecin to Schwedt
• Transport: Subsea Template for Svalin Project, Gryfino - Szczecin
•Work by bullding of Niemieckie Quay in Stettin
• Heavy Transport Oderberg – Duisburg

2013

• PROJECT LEOPARD & RoRo-Transport, Cylinder Transport on the Upper Weser, dimensions 7,70 x 6,52 x 6,62, weight 138,2 Tons.
• Participation in project: hydrotechnical work in Laba – Hawela Canal.
• Hydrotechnical work on the river Warta
• Hydrotechnical work in Harbor Świnoujście
• Transport of water-blocks, Frankfurt/ Odra km 581 to 593.
• Transport of water-blocks, MLK Westerkappeln, 54.000 tons.
• Hydrotechnical work on the river Odra/ Cedynia
• Participation in project: „Modernization of Wrocław water route“
• Heavy Transport, Police – Szczecin
• Participation in project: „ the West Pomeranian Sailing Route“

2014

• Participation in project: hydrotechnical work in Laba – Hawela Canal.
• Transport of water-blocks, MLK Westerkappeln.
• Participation in project: „Modernization of Wrocław water route“
• Participation in project: „ the West Pomeranian Sailing Route (Harbor Szczecin) “
• Modernization of the fairway Swinoujscie-Szczecin RSS Piast and Mieliński

2015

• Participation in project: hydrotechnical work in Laba – Hawela Canal.
• Participation in project: „Modernization of Wroclaw water route“
• Modernization of the fairway Swinoujscie-Szczecin RSS Piast and Mielinski
• Heavy Transport, Malczyce – Salzgitter, 3 Converter, 7,75 x 7,75 x 3,05; 140.000,00 Kg
• Towing of 2 Hydraulic anchor pile pontoons from Wroclaw to Magdeburg
• Participation in "Reconstruction and extension of seacoast entrenchments in Leba project”
• Heavy Transport Schwedt – Szczecin
• Hydrotechnical works in Braunschweig
• Hydrotechnical works of Weser, Liebenau
• Hydrotechnical works in Police, Mnisi Ostrow